Scheduled power interruption in parts of SORSOGON
The National Grid Corporation of the Philippines (NGCP) serves notice of the scheduled shutdown of some of its transmission facilities in these areas:
Date: 15 February 2012
Time: 8:30AM- 5:30PM
Affected Distribution Utility: * Sorsogon Electric Cooperative 1& 2(SORECO 1&2)
Reason: Replacement of poles, cross –arms, insulators and other line hardware and annual preventive maintenance of power equipment
Normal operations will immediately resume after work completion. NGCP’s customers and the general public are advised to take the necessary preparations and precautions for this scheduled interruption.
*Specific cities and municipalities to be affected by the power interruption are determined by the abovementioned Distribution Utility (DU), unless the activity affects the entire franchise area. The DU allots the available power within its franchise area and implements the power interruption schedule among the end-users. (Nelson S. Bautista, South Luzon CorpComm)
No comments:
Post a Comment